This chapter ties common symptoms to the v0.1 operating procedures. Use it alongside Operation Manual, Control System, and Maintenance.
MOE stage issues
Symptom | Likely cause | Corrective action (reference) |
---|---|---|
Fe sump fails to accumulate |
Cathodic overpotential too high or insufficient settling time |
Return to the Fe window parameters (low current density ~0.2–0.4 A cm⁻²) and hold until OES Fe lines stabilize. Allow extra dwell before tapping. |
Silicon alloying with iron |
Fe sump temperature too high or Si stage ramp too aggressive |
Lower sump temperature, reduce potential step to 10 %, and pause feeding until LIBS/OES indicates separation (Section 4.3). |
Excessive bubbling or spatter |
Rapid feed rate or trapped gas pathways |
Reduce feed rate, verify gas ports are clear, and ensure the argon blanket is within the 50–150 mbar range. |
Vacuum refining problems
Symptom | Likely cause | Corrective action |
---|---|---|
RGA shows rising phosphorous despite hold |
Insufficient temperature or pressure not reaching ≤10 Pa |
Increase refining temperature toward 1800 °C and verify vacuum integrity using the dry-run leak criteria. |
RGA spike at m/z ~44 (SiO) |
Over-evaporation or cold-trap warming |
Tighten cold-trap cooling, lower refining temperature slightly, and inspect trap fill level between runs (Section 4.4). |
Casting defects
Symptom | Likely cause | Corrective action |
---|---|---|
Impurity bands through ingot |
Cooling rate too fast or directional cooling disrupted |
Reset casting ramp to 1–5 K min⁻¹ from bottom to top. Confirm mold coating is intact (Section 4.5). |
Surface oxidation on poured ingot |
Transfer exposure to air |
Use a covered transfer crucible and minimize transit time from refining pot to mold. |
Sensor anomalies
-
Pyrometers drifting: Recalibrate against reference per the testing chapter and check purge gas cleanliness.
-
LIBS/OES noise: Inspect optical windows for condensate buildup and realign fibers after cleaning.
-
Vacuum gauge disagreement: Re-zero Pirani and capacitance manometer, confirm gauge placement is per the utilities chapter.
Document troubleshooting steps alongside batch records so recurring patterns can be addressed during scheduled maintenance.